Internal Test Report · Quality Validation

Round Driving Light Assembly Transient Overvoltage Test Report 20260727021

Report No.:— Report Type:Transient Overvoltage Release:Sanitized public version
Page 1 of 4

Test Request Information:

Requesting Dept.Quality Dept.
ReasonSample Testing

Sample Information:

Sample NameRound Driving Light Assembly
Sample Model********、 ********
Sample Qty1 PCS
Sample Received2026.07.25
Test Dates2026.07.27

Test Requirements:

Test No.Test ItemReference StandardTest Requirement
1Transient OvervoltagePer ISO 16750-2:2023 Clause 4.3.2, 12 V system test method.The device or system performs all designed functions during the disturbance; however, one or more values may exceed specified deviations. All functions automatically recover to the normal operating range after the disturbance stops.

Test Results: , After test Function

Tested by: Test Engineer Reviewed by:

Approved by: Date: 2026.07.27

Page 2 of 4

Test Samples:

Sample No.Sample NameSample ModelSample Qty
1Round Driving Light Assembly********、 ********1 PCS

Sample Photos Before Test:

Test photo

Sample 1

Test Procedure: Transient Overvoltage

1、 Test Equipment:

Equipment NameEquipment No.Calibration Valid Until
DC regulated power supplyBJ-QC02-00242027.03.22
DC regulated power supplyBJ-QC02-00392027.03.22
DC regulated power supplyBJ-QC02-00402027.03.22
Page 3 of 4

2、 Test Conditions:

Temperature: room temperature 25°C.

Voltage: 12 V system test voltage 18 V.

3、 Test Basis:

Per ISO 16750-2:2023 Clause 4.3.2, 12 V system test method.

4、 Test Steps:

1. DUT at room temperature, lit at 13.5 V.

2. Programmable supply outputs 18 V / 400 ms overvoltage pulses, interval ≥1 min, 5 pulses total.

3. Monitor during each pulse: lamp flicker/extinguish and driver reset.

4. After 5 pulses, return to nominal voltage and confirm function self-recovery.

Test photo

5、 Test Results: see table below

Sample No.Test ItemTest RequirementTest Result
1Transient OvervoltageThe device or system performs all designed functions during the disturbance; however, one or more values may exceed specified deviations. All functions automatically recover to the normal operating range after the disturbance stops., After test Function
Page 4 of 4

6、 Test Sample Photos:

Test photo
Test photo

During test · During test

Test photo
Test photo

Time settings · Time settings

Test photo
Test photo
Test photo

*** End of Report ***