Home › Research › Test Reports › Light Bar Side Cover Salt Spray Test Report 20260731045
Internal Test Report · Quality Validation

Light Bar Side Cover Salt Spray Test Report 20260731045

Report No.:— Report Type:Salt Spray Test Release:Sanitized public version
Page 1 of 5

Test Request Information:

Requesting Dept.Quality Dept.
ReasonSample Testing

Sample Information:

Sample NameLight Bar Side Cover
Sample Model********、 ********
Sample Qty2 sets
Sample Received2026/7/9
Test Dates2026/7/11-2026/7/31

Test Requirements:

Test No.Test ItemReference StandardTest Requirement
1Salt Spray TestPer GB/T 10485-2025 Clause 9, lamp structural parts tested for 480 hours.After the test, no visible change on internal part surfaces and no visible substrate corrosion on external metal parts.

Test Results: Appearance , passed

Tested by: Test Engineer Reviewed by:

Approved by: Date: 2026.7.31

Page 2 of 5

Test Samples:

Sample No.Sample NameSample ModelSample Qty
1Light Bar Side Cover********、 ********2 sets

Sample Photos Before Test:

Test photo
Test photo

Sample 1 · Sample 2

Test photo
Test photo

Sample 3 · Sample 4

Page 3 of 5

Test Procedure: Salt Spray Test

1、 Test Equipment:

Equipment NameEquipment No.Calibration Valid Until
Salt spray test chamber0004-001-00902027.3.22

2、 Test Conditions:

Temperature: 35°C ±2°C.

Salt Spray Type Neutral salt spray, NaCl solution 50 g/L ±5 g/L, pH 6.5-7.2, deposition rate (1.5 mL ±0.5 mL)/(80 cm²·h), continuous spray.

Test duration: 480 hours.

3、 Test Basis:

Per GB/T 10485-2025 Clause 9, lamp structural parts tested for 480 hours.

4、 Test Steps:

1、 Place samples in the test chamber simulating actual vehicle installation.

2、 Each cycle: 23 h continuous spray + 1 h pause. Test ends at the pause phase. Lamp main structural parts undergo 20 cycles.

3、 Remove samples for periodic inspection when necessary without touching the test surface; return samples to the rack in the original exposure orientation after inspection.

4、 After the test, rinse salt deposits off sample surfaces with deionized water and dry under natural convection.

5. Evaluate test results.

Page 4 of 5

Test Results: see table below

Sample No.Test ItemTest RequirementTest Result
1Salt Spray TestAfter the test, no visible change on internal part surfaces and no visible substrate corrosion on external metal parts.Appearance , passed
Page 5 of 5

Sample Photos After Test:

Test photo
Test photo

During test · During test

Test photo
Test photo

Sample · Calibration label

*** End of Report ***

Need validation data like this for your OEM/ODM project? Aurora engineering responds within one business day.

Request a QuoteExplore Our Manufacturing
← Back to All Test Reports